
Kawasaki
VN1500
Bobber
Created - April 2010 - May 2010
Ladies and Gentlemen, this is - "Suckin' Gas"
Another new
steed arrives at the stable
(Because Ade wants a to build a custom
bobber to ride for the Summer)
We bought this bike with the
intention of a full ground up rebuild to be completed within 3 - 4 weeks!
Everything had to be stripped for fabrication, polishing, chroming, paint etc
etc...
Comments or questions Email
How the bike
stands April 2010

![]()
The Strip down..
Work begins April
2010
Strip the bike to bits, sort everything for polishing, paint, chrome,
replacement





![]()
Preparing & design of the custom paint
scheme
We decided on a Blue and Black Scallop theme with Silver pin striping and a hint
of Silver flake in the lacquer to bring it alive.
After everything is filled, prepared and primered, we can work on the stages of
paint and lacquer.










![]()
Frame and Engine
The frame is re
painted in Gloss black, the engine is stripped and finished in Satin Black.



![]()
Wheels
Both wheels are re chromed and finish the hubs in Satin Black, then laced with
stainless spokes.
We polish each individual spoke on both wheels!




![]()
Front end and detailing
The front forks are polished along with the top yoke.
We replace the brake lines with braided hoses and stainless banjos.
We replace all the Nuts and bolts with Polished stainless spike nuts where
required.
Brake and Clutch levers are polished along with the fluid reservoirs. Right and
left switch gear are coated in Satin black.
Billet spike grips are fitted on the 2 inch thick ape bars.





![]()
Rear end and detailing
As with everything else on the bike, all the rear end is polished where
required, braided hoses fitted and new huge rear shocks.
The shaft cover is polished and also the rear brake calliper. All finished in
Polished stainless spike nuts throughout.
New custom tail light, new chromed fender bars and new chromed side panels.



![]()
The finished bike... This is - "Suckin' Gas"
The bike complete. Fitted with the new chrome pipes, cut down and slashed.
Footboards
Everything newly chromed including the footboards, Headlight, brake lever,
brackets etc etc.
Everything that's stainless is mirror polished. Spike nuts throughout the bike.
Built in record time of only 3 weeks! It rides and sounds incredible!!




![]()

Before After
![]()